| Throughout the duration of the course, the student will become familiar through continual practical use of all aspects of the equipment used in the setting out process. |
| Total Station (also known as EDM) |
|
This accurately measures the distance and bearing between two points, and with its onboard computer, can calculate the co-ordinates of any point on site. |
| Automatic Level and Laser Level |
|
These instruments accurately identify levels on site. |
|
| Pipe Level |
|
Sets drainage to the required line and level. |
| Pre-Programmed Calculator |
|
To aid bearing, distance and co-ordinate calculations. (Note: Calculator model may vary.) |